Capital Plans - YMCA Camp Marston
Camp Marston is entering Phase 5 of a Master Plan that was developed in the early 1990's! 8 new Lodges, two staff housing structures, major infrastructure, the Central Bathroom, Gilmore Dining Hall renovation and many smaller projects have changed the face of San Diego's most popular camp.
Over $4,000,000 in improvments have occurred during the past decade.
Our next step in the Master Plan is to replace existing structures with three new facilities:
- Camper Lodge #7 with new Health Center in basement
- Camper Lodge #9 with Trail Head Bathroom in basement.
- Year Round Staff Dorm to serve 16 Full-Time Program Staff.

Rendering of proposed Lodge #7 with Health Center on lower floor.
|